United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· SPPOnshore wind project GEN-2018-122, Baylor County
Onshore wind project GEN-2018-122, Baylor County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Baylor County, Texas, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2018 (completed)
- Withdrawn / abandonedDec 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2018-122
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Oklaunion 345kV Substation
- Location
- Baylor County, Texas
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 21 November 2018
- Proposed online date
- December 2027
- Withdrawn
- December 2022
Location
Marker shows the centre of Baylor County; the queue data does not give exact sites.
Other requests in Baylor County
- Dundee East A WindOnshore wind Β· 524 MW Β· agreement signed
- Dundee East B WindOnshore wind Β· 261 MW Β· agreement signed
- Velveteen Solar ISolar Β· 509 MW Β· in study
- Velveteen Solar IISolar Β· 306 MW Β· in study
- Diversion WindOnshore wind Β· 300 MW Β· suspended
- Onshore wind project GEN-2017-033, Baylor CountyOnshore wind Β· 200 MW Β· built
- S_Hills WindOnshore wind Β· 30.2 MW Β· built
- Dundee East A Wind PlaceholderOnshore wind Β· 524 MW Β· withdrawn
- Onshore wind project GEN-2022-191, Baylor CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem