πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project J077, Polk County

Onshore wind project J077, Polk County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Polk County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2009 (completed)
  2. Withdrawn / abandonedJan 2013 (project stopped here)
  3. ConsentedJan 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J077
Grid region
MISO (Midcontinent)
Connection point (POI)
OTP Winger 115kV Substation
Location
Polk County, Minnesota
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
5 October 2009
Agreement signed
30 January 2013
Proposed online date
May 2014
Withdrawn
January 2013

Location

Marker shows the centre of Polk County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Polk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem