United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project MPC01400, Polk County
Onshore wind project MPC01400, Polk County is a 160 MW onshore wind request withdrawn in the MISO interconnection queue, in Polk County, Minnesota, connecting to Minnkota Power Cooperative.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2008 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- MPC01400
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Minnkota Power Cooperative
- Connection point (POI)
- Falconer Crookston 115 kV Line
- Location
- Polk County, Minnesota
- Technology
- Wind: 160 MW
- Total requested
- 160 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 8 May 2008
- Proposed online date
- October 2011
Location
Marker shows the centre of Polk County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Polk County
- Solar project J2749, Polk CountySolar Β· 150 MW Β· in study
- Solar project J3952, Polk CountySolar Β· 395 MW Β· withdrawn
- Onshore wind project J1081, Polk CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project J062, Polk CountyOnshore wind Β· 250 MW Β· withdrawn
- Solar project J3951, Polk CountySolar Β· 218 MW Β· withdrawn
- Onshore wind project H032, Polk CountyOnshore wind Β· 180 MW Β· withdrawn
- Solar project J2291, Polk CountySolar Β· 150 MW Β· withdrawn
- Solar project J2286, Polk CountySolar Β· 90.0 MW Β· withdrawn
- Solar project J1941, Polk CountySolar Β· 60.0 MW Β· withdrawn
- Onshore wind project J077, Polk CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Battery storage project J2285, Polk CountyBattery storage Β· 45.0 MW Β· withdrawn
- Battery storage project J1968, Polk CountyBattery storage Β· 30.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem