United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
SOLAR Β· MISOSolar project J3951, Polk County
Solar project J3951, Polk County is a 218 MW solar request withdrawn in the MISO interconnection queue, in Polk County, Minnesota, connecting to OTTER TAIL POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2025 (completed)
- Withdrawn / abandonedJan 2026 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3951
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- OTTER TAIL POWER COMPANY
- Connection point (POI)
- Other_
- Location
- Polk County, Minnesota
- Technology
- Solar: 218 MW
- Total requested
- 218 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 26 February 2025
- Proposed online date
- June 2030
- Withdrawn
- January 2026
Location
Marker shows the centre of Polk County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Polk County
- Solar project J2749, Polk CountySolar Β· 150 MW Β· in study
- Solar project J3952, Polk CountySolar Β· 395 MW Β· withdrawn
- Onshore wind project J1081, Polk CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project J062, Polk CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project H032, Polk CountyOnshore wind Β· 180 MW Β· withdrawn
- Onshore wind project MPC01400, Polk CountyOnshore wind Β· 160 MW Β· withdrawn
- Solar project J2291, Polk CountySolar Β· 150 MW Β· withdrawn
- Solar project J2286, Polk CountySolar Β· 90.0 MW Β· withdrawn
- Solar project J1941, Polk CountySolar Β· 60.0 MW Β· withdrawn
- Onshore wind project J077, Polk CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Battery storage project J2285, Polk CountyBattery storage Β· 45.0 MW Β· withdrawn
- Battery storage project J1968, Polk CountyBattery storage Β· 30.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem