Gas project GEN-2012-010, Yoakum County

Gas project GEN-2012-010, Yoakum County is a 15.0 MW gas request withdrawn in the SPP interconnection queue, in Yoakum County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingJun 2014 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2012-010
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Mustang 230kV
Location
Yoakum County, Texas
Technology
Gas: 15.0 MW
Total requested
15.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 March 2012
Proposed online date
June 2014
Came online
June 2014

Location

Marker shows the centre of Yoakum County; the queue data does not give exact sites.