United States › Grid › Interconnection queues › Illinois

GAS · PJM

Lincoln Generating Facility

Lincoln Generating Facility is a 40.0 MW gas request built and operating in the PJM interconnection queue, in Will County, Illinois, connecting to ComEd.

Queue statusOperating
  1. PlanningQueued Oct 2008 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 2013 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
U3-031
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Lincoln Generating Facility
Location
Will County, Illinois
Technology
Gas: 40.0 MW
Total requested
40.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
31 October 2008
Proposed online date
October 2009
Came online
January 2013

Location

Marker shows the centre of Will County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Will County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem