United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR + STORAGE Β· WEST

Solar + storage project 116, Kittitas County

Solar + storage project 116, Kittitas County is a 300 MW solar + storage request withdrawn in the West interconnection queue, in Kittitas County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
116
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Proposed new substation on Cascade-Rocky Reach 230 kV Line
Location
Kittitas County, Washington
Technology
Solar: 300 MW Β· Battery
Total requested
300 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
25 August 2021
Proposed online date
September 2025

Location

Marker shows the centre of Kittitas County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Kittitas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem