United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project G1034, Kittitas County

Onshore wind project G1034, Kittitas County is a 400 MW onshore wind request withdrawn in the West interconnection queue, in Kittitas County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G1034
Grid region
West (non-ISO utilities)
Connection point (POI)
Rocky Reach-Columbia No 1 230 kV line
Location
Kittitas County, Washington
Technology
Wind: 400 MW
Total requested
400 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
21 November 2023
Proposed online date
October 2028

Location

Marker shows the centre of Kittitas County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Kittitas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem