United States βΊ Grid βΊ Interconnection queues βΊ Ohio
OTHER Β· PJMColumbus Floodwall
Columbus Floodwall is a 7.5 MW other request built and operating in the PJM interconnection queue, in Franklin County, Ohio, connecting to AEP.
Request details
- Queue ID
- P44
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- City of Columbus
- Location
- Franklin County, Ohio
- Technology
- Diesel: 7.5 MW
- Total requested
- 7.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 16 January 2006
- Proposed online date
- December 2006
- Came online
- December 2006
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Other requests in Franklin County
- Pleasant Prairie Solar Energy CenterSolar Β· 200 MW Β· agreement signed
- Pleasant Prairie Solar Energy CenterSolar Β· 50.0 MW Β· agreement signed
- Battery storage project AG2-376, Franklin CountyBattery storage Β· 400 MW Β· withdrawn
- Solar project AG1-042, Franklin CountySolar Β· 100 MW Β· withdrawn
- Hayden RunSolar Β· 100 MW Β· withdrawn
- Solar project AH1-270, Franklin CountySolar Β· 85.0 MW Β· withdrawn
- Solar project AB1-136, Franklin CountySolar Β· 80.0 MW Β· withdrawn
- Battery storage project AH1-318, Franklin CountyBattery storage Β· 60.0 MW Β· withdrawn
- Battery storage project AG2-499, Franklin CountyBattery storage Β· 50.0 MW Β· withdrawn
- Battery storage project AG2-498, Franklin CountyBattery storage Β· 50.0 MW Β· withdrawn
- Gas project AA1-130, Franklin CountyGas Β· 5.0 MW Β· withdrawn
- Battery storage project Z1-064, Franklin CountyBattery storage Β· 4.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem