United States › Grid › Interconnection queues › Ohio
SOLAR · PJMPleasant Prairie Solar Energy Center
Pleasant Prairie Solar Energy Center is a 50.0 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Franklin County, Ohio, connecting to AEP.
Queue statusConsented
- PlanningQueued Sep 2019 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AF1-275
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Cole 345 kV
- Location
- Franklin County, Ohio
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Active
- Entered queue
- 30 September 2019
- Proposed online date
- December 2027
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Other requests in Franklin County
- Pleasant Prairie Solar Energy CenterSolar · 200 MW · agreement signed
- Columbus FloodwallOther · 7.5 MW · built
- Battery storage project AG2-376, Franklin CountyBattery storage · 400 MW · withdrawn
- Solar project AG1-042, Franklin CountySolar · 100 MW · withdrawn
- Hayden RunSolar · 100 MW · withdrawn
- Solar project AH1-270, Franklin CountySolar · 85.0 MW · withdrawn
- Solar project AB1-136, Franklin CountySolar · 80.0 MW · withdrawn
- Battery storage project AH1-318, Franklin CountyBattery storage · 60.0 MW · withdrawn
- Battery storage project AG2-499, Franklin CountyBattery storage · 50.0 MW · withdrawn
- Battery storage project AG2-498, Franklin CountyBattery storage · 50.0 MW · withdrawn
- Gas project AA1-130, Franklin CountyGas · 5.0 MW · withdrawn
- Battery storage project Z1-064, Franklin CountyBattery storage · 4.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem