ONSHORE WIND Β· WESTOnshore wind project GI-0707, Mchenry County
Onshore wind project GI-0707, Mchenry County is a 242 MW onshore wind request withdrawn in the West interconnection queue, in Mchenry County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0707
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Neal 115kV
- Location
- Mchenry County, North Dakota
- Technology
- Wind: 242 MW
- Total requested
- 242 MW
- Service type
- NRIS and ERIS
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 12 April 2007
- Proposed online date
- October 2010
Location
Marker shows the centre of Mchenry County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Mchenry County
- Onshore wind project G830, Mchenry CountyOnshore wind Β· 99.0 MW Β· built
- Onshore wind project G408, Mchenry CountyOnshore wind Β· 12.0 MW Β· built
- Onshore wind project J746, Mchenry CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J1754, Mchenry CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project G328, Mchenry CountyOnshore wind Β· 12.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem