United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
ONSHORE WIND Β· MISOOnshore wind project J746, Mchenry County
Onshore wind project J746, Mchenry County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Mchenry County, North Dakota, connecting to GREAT RIVER ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandonedAug 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J746
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- GREAT RIVER ENERGY
- Connection point (POI)
- Stanton-McHenry 230kV
- Location
- Mchenry County, North Dakota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 November 2016
- Proposed online date
- August 2020
- Withdrawn
- August 2019
Location
Marker shows the centre of Mchenry County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Mchenry County
- Onshore wind project G830, Mchenry CountyOnshore wind Β· 99.0 MW Β· built
- Onshore wind project G408, Mchenry CountyOnshore wind Β· 12.0 MW Β· built
- Onshore wind project GI-0707, Mchenry CountyOnshore wind Β· 242 MW Β· withdrawn
- Onshore wind project J1754, Mchenry CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project G328, Mchenry CountyOnshore wind Β· 12.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem