United States βΊ Grid βΊ Interconnection queues βΊ Montana
BATTERY STORAGE Β· WESTBattery storage project 372, Deer Lodge County
Battery storage project 372, Deer Lodge County is a 150 MW battery storage request withdrawn in the West interconnection queue, in Deer Lodge County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 372
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- 230 kV at Anaconda Mill Creek Substation
- Location
- Deer Lodge County, Montana
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 28 January 2020
- Proposed online date
- November 2022
Location
Marker shows the centre of Deer Lodge County; the queue data does not give exact sites.
Other requests in Deer Lodge County
- Gas project 77, Deer Lodge CountyGas Β· 213 MW Β· built
- Solar + storage project 423, Deer Lodge CountySolar + storage Β· 400 MW Β· withdrawn
- Solar project Affected System to BPA G0630, Deer Lodge CountySolar Β· 300 MW Β· withdrawn
- Solar project G0630, Deer Lodge CountySolar Β· 300 MW Β· withdrawn
- Solar + storage project 375, Deer Lodge CountySolar + storage Β· 200 MW Β· withdrawn
- Battery storage project 381, Deer Lodge CountyBattery storage Β· 150 MW Β· withdrawn
- Onshore wind project 136, Deer Lodge CountyOnshore wind Β· 20.0 MW Β· withdrawn
- Solar project 191, Deer Lodge CountySolar Β· 3.0 MW Β· withdrawn
- Solar project 190, Deer Lodge CountySolar Β· 3.0 MW Β· withdrawn
- Solar project 192, Deer Lodge CountySolar Β· 3.0 MW Β· withdrawn
- Battery storage project 138, Deer Lodge CountyBattery storage Β· 1.0 MW Β· withdrawn
- Battery storage project 131, Deer Lodge CountyBattery storage Β· 1.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem