United States βΊ Grid βΊ Interconnection queues βΊ Montana
SOLAR Β· WESTSolar project G0630, Deer Lodge County
Solar project G0630, Deer Lodge County is a 300 MW solar request withdrawn in the West interconnection queue, in Deer Lodge County, Montana.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G0630
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- BPA's Anaconda Substation via 230 kV transmission line.
- Location
- Deer Lodge County, Montana
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 28 October 2019
- Proposed online date
- December 2022
Location
Marker shows the centre of Deer Lodge County; the queue data does not give exact sites.
Other requests in Deer Lodge County
- Gas project 77, Deer Lodge CountyGas Β· 213 MW Β· built
- Solar + storage project 423, Deer Lodge CountySolar + storage Β· 400 MW Β· withdrawn
- Solar project Affected System to BPA G0630, Deer Lodge CountySolar Β· 300 MW Β· withdrawn
- Solar + storage project 375, Deer Lodge CountySolar + storage Β· 200 MW Β· withdrawn
- Battery storage project 372, Deer Lodge CountyBattery storage Β· 150 MW Β· withdrawn
- Battery storage project 381, Deer Lodge CountyBattery storage Β· 150 MW Β· withdrawn
- Onshore wind project 136, Deer Lodge CountyOnshore wind Β· 20.0 MW Β· withdrawn
- Solar project 191, Deer Lodge CountySolar Β· 3.0 MW Β· withdrawn
- Solar project 190, Deer Lodge CountySolar Β· 3.0 MW Β· withdrawn
- Solar project 192, Deer Lodge CountySolar Β· 3.0 MW Β· withdrawn
- Battery storage project 138, Deer Lodge CountyBattery storage Β· 1.0 MW Β· withdrawn
- Battery storage project 131, Deer Lodge CountyBattery storage Β· 1.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem