United States βΊ Grid βΊ Interconnection queues βΊ Montana
SOLAR Β· WESTSolar project Affected System to BPA G0630, Deer Lodge County
Solar project Affected System to BPA G0630, Deer Lodge County is a 300 MW solar request withdrawn in the West interconnection queue, in Deer Lodge County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Affected System to BPA G0630
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- BPA Owned 230kV in Anaconda, MT
- Location
- Deer Lodge County, Montana
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 28 April 2020
Location
Marker shows the centre of Deer Lodge County; the queue data does not give exact sites.
Other requests in Deer Lodge County
- Gas project 77, Deer Lodge CountyGas Β· 213 MW Β· built
- Solar + storage project 423, Deer Lodge CountySolar + storage Β· 400 MW Β· withdrawn
- Solar project G0630, Deer Lodge CountySolar Β· 300 MW Β· withdrawn
- Solar + storage project 375, Deer Lodge CountySolar + storage Β· 200 MW Β· withdrawn
- Battery storage project 372, Deer Lodge CountyBattery storage Β· 150 MW Β· withdrawn
- Battery storage project 381, Deer Lodge CountyBattery storage Β· 150 MW Β· withdrawn
- Onshore wind project 136, Deer Lodge CountyOnshore wind Β· 20.0 MW Β· withdrawn
- Solar project 191, Deer Lodge CountySolar Β· 3.0 MW Β· withdrawn
- Solar project 190, Deer Lodge CountySolar Β· 3.0 MW Β· withdrawn
- Solar project 192, Deer Lodge CountySolar Β· 3.0 MW Β· withdrawn
- Battery storage project 138, Deer Lodge CountyBattery storage Β· 1.0 MW Β· withdrawn
- Battery storage project 131, Deer Lodge CountyBattery storage Β· 1.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem