United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

SOLAR Β· WEST

Solar project Affected System to BPA G0630, Deer Lodge County

Solar project Affected System to BPA G0630, Deer Lodge County is a 300 MW solar request withdrawn in the West interconnection queue, in Deer Lodge County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Affected System to BPA G0630
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
BPA Owned 230kV in Anaconda, MT
Location
Deer Lodge County, Montana
Technology
Solar: 300 MW
Total requested
300 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
28 April 2020

Location

Marker shows the centre of Deer Lodge County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Deer Lodge County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem