United States βΊ Grid βΊ Interconnection queues βΊ Nevada
SOLAR Β· WESTSolar project Company 157, Lincoln County
Solar project Company 157, Lincoln County is a 1,000 MW solar request withdrawn in the West interconnection queue, in Lincoln County, Nevada, connecting to NV Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Company 157
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NV Energy
- Location
- Lincoln County, Nevada
- Technology
- Solar: 1,000 MW
- Total requested
- 1,000 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 27 March 2018
- Proposed online date
- September 2020
Location
Marker shows the centre of Lincoln County; the queue data does not give exact sites.
Other requests in Lincoln County
- Gas project 25-00428, Lincoln CountyGas Β· 600 MW Β· in study
- Gas project 25-00422, Lincoln CountyGas Β· 600 MW Β· in study
- Coyote SpringsSolar Β· 960 MW Β· withdrawn
- Solar project Company 90, Lincoln CountySolar Β· 100 MW Β· withdrawn
- Solar project Company EU, Lincoln CountySolar Β· 35.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem