Onshore wind project 12, Kittitas County

Onshore wind project 12, Kittitas County is a 150 MW onshore wind request withdrawn in the West interconnection queue, in Kittitas County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
12
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Wild Horse-Wind Ridge 230kV Line/Wind Ridge
Location
Kittitas County, Washington
Technology
Wind: 150 MW
Total requested
150 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
25 June 2007
Proposed online date
September 2008

Location

Marker shows the centre of Kittitas County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Kittitas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem