Berry Place Storage

Berry Place Storage is a 10.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Livingston County, New York, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2019 (completed)
  2. Withdrawn / abandonedJan 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
964
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
Invenergy Storage Development LLC
Connection point (POI)
Lakeville 34.5kV substation
Location
Livingston County, New York
Technology
Battery: 10.0 MW
Total requested
10.0 MW
Queue status
Withdrawn
Entered queue
20 December 2019
Withdrawn
January 2020

Location

Marker shows the centre of Livingston County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Livingston County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem