United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
ONSHORE WIND Β· PJMOnshore wind project N02_AEP139, Greenbrier County
Onshore wind project N02_AEP139, Greenbrier County is a 200 MW onshore wind request withdrawn in the PJM interconnection queue, in Greenbrier County, West Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2004 (completed)
- Withdrawn / abandonedJun 2005 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- N02_AEP139
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- McClung 138kV
- Location
- Greenbrier County, West Virginia
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 4 August 2004
- Proposed online date
- September 2006
- Withdrawn
- June 2005
Location
Marker shows the centre of Greenbrier County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Greenbrier County
- Beech Ridge / Field Mtn WFWind + storage Β· 186 MW Β· built
- Beech Ridge Wind FarmOnshore wind Β· 50.6 MW Β· built
- Beech Ridge Wind FarmOnshore wind Β· 5.0 MW Β· built
- West GreenbrierCoal Β· 90.0 MW Β· withdrawn
- Solar project AG1-234, Greenbrier CountySolar Β· 50.0 MW Β· withdrawn
- Trillium PV ISolar Β· 28.0 MW Β· withdrawn
- Coal project Q61, Greenbrier CountyCoal Β· 10.0 MW Β· withdrawn
- Tri-State SolarSolar Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem