WIND + STORAGE · PJMBeech Ridge / Field Mtn WF
Beech Ridge / Field Mtn WF is a 186 MW wind + storage request built and operating in the PJM interconnection queue, in Greenbrier County, West Virginia, connecting to APS.
Request details
- Queue ID
- M24
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Grassy Falls
- Location
- Greenbrier County, West Virginia
- Technology
- Wind: 186 MW · Battery
- Total requested
- 186 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 27 July 2004
- Proposed online date
- December 2014
- Came online
- November 2007
Location
Marker shows the centre of Greenbrier County; the queue data does not give exact sites.
Power plants in West Virginia · Transmission lines in West Virginia
Other requests in Greenbrier County
- Beech Ridge Wind FarmOnshore wind · 50.6 MW · built
- Beech Ridge Wind FarmOnshore wind · 5.0 MW · built
- Onshore wind project N02_AEP139, Greenbrier CountyOnshore wind · 200 MW · withdrawn
- West GreenbrierCoal · 90.0 MW · withdrawn
- Solar project AG1-234, Greenbrier CountySolar · 50.0 MW · withdrawn
- Trillium PV ISolar · 28.0 MW · withdrawn
- Coal project Q61, Greenbrier CountyCoal · 10.0 MW · withdrawn
- Tri-State SolarSolar · 5.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem