United States › Grid › Interconnection queues › Illinois
ONSHORE WIND · PJMBaileyville Wind Farm
Baileyville Wind Farm is a 80.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Stephenson County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2003 (completed)
- Withdrawn / abandonedAug 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- K02_CE18
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Baileyville Wind Farm
- Location
- Stephenson County, Illinois
- Technology
- Wind: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Withdrawn
- Entered queue
- 26 February 2003
- Proposed online date
- December 2011
- Withdrawn
- August 2013
Location
Marker shows the centre of Stephenson County; the queue data does not give exact sites.
Other requests in Stephenson County
- Onshore wind project AI1-191, Stephenson CountyOnshore wind · 200 MW · in study
- Battery storage project AH2-204, Stephenson CountyBattery storage · 170 MW · in study
- Solar + storage project AI1-174, Stephenson CountySolar + storage · 118 MW · in study
- Battery storage project AH2-375, Stephenson CountyBattery storage · 106 MW · in study
- Battery storage project AH2-372, Stephenson CountyBattery storage · 52.0 MW · in study
- Solar project AI1-173, Stephenson CountySolar · 16.0 MW · in study
- High Point II SolarSolar · 50.0 MW · built
- High Point SolarSolar · 50.0 MW · built
- Onshore wind project AF1-314, Stephenson CountyOnshore wind · 212 MW · withdrawn
- Onshore wind project AF2-267, Stephenson CountyOnshore wind · 211 MW · withdrawn
- Onshore wind project R96, Stephenson CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project R64, Stephenson CountyOnshore wind · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem