Baileyville Wind Farm

Baileyville Wind Farm is a 80.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Stephenson County, Illinois, connecting to ComEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2003 (completed)
  2. Withdrawn / abandonedAug 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
K02_CE18
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Baileyville Wind Farm
Location
Stephenson County, Illinois
Technology
Wind: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Withdrawn
Entered queue
26 February 2003
Proposed online date
December 2011
Withdrawn
August 2013

Location

Marker shows the centre of Stephenson County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Stephenson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem