United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· PJMOnshore wind project R96, Stephenson County
Onshore wind project R96, Stephenson County is a 200 MW onshore wind request withdrawn in the PJM interconnection queue, in Stephenson County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2007 (completed)
- Withdrawn / abandonedAug 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R96
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Lancaster-Maryland 138kV
- Location
- Stephenson County, Illinois
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 January 2007
- Proposed online date
- May 2010
- Withdrawn
- August 2012
Location
Marker shows the centre of Stephenson County; the queue data does not give exact sites.
Other requests in Stephenson County
- Onshore wind project AI1-191, Stephenson CountyOnshore wind Β· 200 MW Β· in study
- Battery storage project AH2-204, Stephenson CountyBattery storage Β· 170 MW Β· in study
- Solar + storage project AI1-174, Stephenson CountySolar + storage Β· 118 MW Β· in study
- Battery storage project AH2-375, Stephenson CountyBattery storage Β· 106 MW Β· in study
- Battery storage project AH2-372, Stephenson CountyBattery storage Β· 52.0 MW Β· in study
- Solar project AI1-173, Stephenson CountySolar Β· 16.0 MW Β· in study
- High Point II SolarSolar Β· 50.0 MW Β· built
- High Point SolarSolar Β· 50.0 MW Β· built
- Onshore wind project AF1-314, Stephenson CountyOnshore wind Β· 212 MW Β· withdrawn
- Onshore wind project AF2-267, Stephenson CountyOnshore wind Β· 211 MW Β· withdrawn
- Onshore wind project R64, Stephenson CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project U2-003, Stephenson CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem