Battery storage project GEN-2021-102, Douglas County

Battery storage project GEN-2021-102, Douglas County is a 80.0 MW battery storage request withdrawn in the SPP interconnection queue, in Douglas County, Kansas, connecting to WERE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2021 (completed)
  2. Withdrawn / abandonedJul 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingSep 2025 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2021-102
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WERE
Connection point (POI)
Evergy's Midland Substation 115kV bus
Location
Douglas County, Kansas
Technology
Battery: 80.0 MW
Total requested
80.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
25 May 2021
Proposed online date
September 2025
Came online
September 2025
Withdrawn
July 2023

Location

Marker shows the centre of Douglas County; the queue data does not give exact sites.

Power plants in Kansas Β· Transmission lines in Kansas

Other requests in Douglas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem