United States βΊ Grid βΊ Interconnection queues βΊ Kansas
BATTERY STORAGE Β· SPPBattery storage project GEN-2021-102, Douglas County
Battery storage project GEN-2021-102, Douglas County is a 80.0 MW battery storage request withdrawn in the SPP interconnection queue, in Douglas County, Kansas, connecting to WERE.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2021 (completed)
- Withdrawn / abandonedJul 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingSep 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-102
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Connection point (POI)
- Evergy's Midland Substation 115kV bus
- Location
- Douglas County, Kansas
- Technology
- Battery: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 25 May 2021
- Proposed online date
- September 2025
- Came online
- September 2025
- Withdrawn
- July 2023
Location
Marker shows the centre of Douglas County; the queue data does not give exact sites.
Other requests in Douglas County
- Solar project GEN-2021-101, Douglas CountySolar Β· 159 MW Β· agreement signed
- Hydro project GEN-2010-036, Douglas CountyHydro Β· 4.6 MW Β· built
- Onshore wind project GEN-2013-043, Douglas CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project GEN-2014-050, Douglas CountyOnshore wind Β· 100 MW Β· withdrawn
- Battery storage project GEN-2023-190, Douglas CountyBattery storage Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem