United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
ONSHORE WIND Β· SPPOnshore wind project GEN-2015-093, Caddo County
Onshore wind project GEN-2015-093, Caddo County is a 250 MW onshore wind request withdrawn in the SPP interconnection queue, in Caddo County, Oklahoma, connecting to OGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2015 (completed)
- Withdrawn / abandonedSep 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2015-093
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- Gracemont 345kV
- Location
- Caddo County, Oklahoma
- Technology
- Wind: 250 MW
- Total requested
- 250 MW
- Service type
- Energy only (ERIS)
- Study phase
- TERMINATED
- Queue status
- Withdrawn
- Entered queue
- 29 September 2015
- Proposed online date
- December 2025
- Came online
- December 2025
- Withdrawn
- September 2024
Location
Marker shows the centre of Caddo County; the queue data does not give exact sites.
Other requests in Caddo County
- Solar project GEN-2018-048, Caddo CountySolar Β· 300 MW Β· agreement signed
- Gas project GEN-2023-GR1, Caddo CountyGas Β· 97.5 MW Β· agreement signed
- Gas project GEN-2024-128, Caddo CountyGas Β· 690 MW Β· in study
- Onshore wind project GEN-2023-229, Caddo CountyOnshore wind Β· 230 MW Β· in study
- Solar project ERAS-2025-025, Caddo CountySolar Β· 175 MW Β· in study
- Solar + storage project GEN-2021-064, Caddo CountySolar + storage Β· 100 MW Β· in study
- Onshore wind project GEN-2016-091, Caddo CountyOnshore wind Β· 304 MW Β· built
- Onshore wind project GEN-2016-095, Caddo CountyOnshore wind Β· 200 MW Β· built
- Gas project GEN-2005-022, Caddo CountyGas Β· 177 MW Β· built
- Gas project GEN-2007-052, Caddo CountyGas Β· 150 MW Β· built
- Onshore wind project GEN-2011-010, Caddo CountyOnshore wind Β· 101 MW Β· built
- Onshore wind project GEN-2016-097, Caddo CountyOnshore wind Β· 100 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem