Onshore wind project GEN-2015-093, Caddo County

Onshore wind project GEN-2015-093, Caddo County is a 250 MW onshore wind request withdrawn in the SPP interconnection queue, in Caddo County, Oklahoma, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2015 (completed)
  2. Withdrawn / abandonedSep 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingDec 2025 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2015-093
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
Gracemont 345kV
Location
Caddo County, Oklahoma
Technology
Wind: 250 MW
Total requested
250 MW
Service type
Energy only (ERIS)
Study phase
TERMINATED
Queue status
Withdrawn
Entered queue
29 September 2015
Proposed online date
December 2025
Came online
December 2025
Withdrawn
September 2024

Location

Marker shows the centre of Caddo County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Caddo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem