United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Eiffel Solar POI 2

Eiffel Solar POI 2 is a 200 MW solar request withdrawn in the ERCOT interconnection queue, in Lamar County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2019 (completed)
  2. Withdrawn / abandonedOct 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0230
Grid region
ERCOT (Texas)
Developer
Paris Farm Solar, LLC
Connection point (POI)
1693 Paris 138kV
Location
Lamar County, Texas
Technology
Solar: 200 MW
Total requested
200 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
25 August 2019
Proposed online date
June 2022
Withdrawn
October 2019

Location

Marker shows the centre of Lamar County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Lamar County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem