United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
SOLAR Β· PJMSolar project AB2-128, Northampton County
Solar project AB2-128, Northampton County is a 80.0 MW solar request withdrawn in the PJM interconnection queue, in Northampton County, North Carolina, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2016 (completed)
- Withdrawn / abandonedJul 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB2-128
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Clubhouse-Lakeview 230kV
- Location
- Northampton County, North Carolina
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 29 April 2016
- Proposed online date
- October 2017
- Withdrawn
- July 2017
Location
Marker shows the centre of Northampton County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Northampton County
- Cherry SolarSolar Β· 180 MW Β· agreement signed
- Oak SolarSolar Β· 120 MW Β· built
- Gutenberg SolarSolar Β· 74.9 MW Β· built
- Spuds Lane Solar ParkSolar Β· 74.9 MW Β· built
- Gutenberg SolarSolar Β· 5.0 MW Β· built
- Solar project AC2-093, Northampton CountySolar Β· 675 MW Β· withdrawn
- Solar project AA1-064, Northampton CountySolar Β· 80.0 MW Β· withdrawn
- Solar project AA2-181, Northampton CountySolar Β· 80.0 MW Β· withdrawn
- Solar project AC2-159, Northampton CountySolar Β· 80.0 MW Β· withdrawn
- Solar project AA1-137, Northampton CountySolar Β· 80.0 MW Β· withdrawn
- ACE Development Company, LLCSolar Β· 75.0 MW Β· withdrawn
- Solar project AG1-313, Northampton CountySolar Β· 46.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem