United States › Grid › Interconnection queues › North Carolina

SOLAR · PJM

ACE Development Company, LLC

ACE Development Company, LLC is a 75.0 MW solar request withdrawn in the PJM interconnection queue, in Northampton County, North Carolina, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-434
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Developer
ACE Development Company, LLC
Connection point (POI)
Carolina- Earleys 115kV
Location
Northampton County, North Carolina
Technology
Solar: 75.0 MW
Total requested
75.0 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
10 September 2021
Proposed online date
September 2026
Withdrawn
July 2025

Location

Marker shows the centre of Northampton County; the queue data does not give exact sites.

Power plants in North Carolina · Transmission lines in North Carolina

Other requests in Northampton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem