United States › Grid › Interconnection queues › Virginia

GAS · PJM

Wolf Hills Energy Plant

Wolf Hills Energy Plant is a 15.0 MW gas request built and operating in the PJM interconnection queue, in Washington County, Virginia, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Oct 2004 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2005 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
N11
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Wolf Hills 138 kV
Location
Washington County, Virginia
Technology
Gas: 15.0 MW
Total requested
15.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
11 October 2004
Proposed online date
June 2005
Came online
June 2005

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem