🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Virginia

BATTERY STORAGE · PJM

Battery storage project AI2-002, Washington County

Battery storage project AI2-002, Washington County is a 150 MW battery storage request in interconnection study in the PJM interconnection queue, in Washington County, Virginia, connecting to APS.

Queue statusIn planning
  1. PlanningQueued Oct 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget May 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AI2-002
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Vanceville 138 kV
Location
Washington County, Virginia
Technology
Battery: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Active
Entered queue
1 October 2022
Proposed online date
May 2028

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem