United States βΊ Grid βΊ Interconnection queues βΊ Virginia
BATTERY STORAGE Β· PJMBattery storage project AH1-063, Washington County
Battery storage project AH1-063, Washington County is a 100 MW battery storage request withdrawn in the PJM interconnection queue, in Washington County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-063
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Spring Creek βΓΓ¬ South Abingdon 138 kV
- Location
- Washington County, Virginia
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 26 July 2021
- Proposed online date
- July 2024
- Withdrawn
- December 2024
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- Battery storage project AI2-002, Washington CountyBattery storage Β· 150 MW Β· in study
- Battery storage project AH2-072, Washington CountyBattery storage Β· 62.1 MW Β· in study
- Wolf Hills Energy PlantGas Β· 19.0 MW Β· built
- Wolf Hills Energy PlantGas Β· 15.0 MW Β· built
- Other project 185, Washington CountyOther Β· 250 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem