BATTERY STORAGE Β· PJM

Battery storage project AH1-063, Washington County

Battery storage project AH1-063, Washington County is a 100 MW battery storage request withdrawn in the PJM interconnection queue, in Washington County, Virginia, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2021 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-063
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Spring Creek β€šΓ„Γ¬ South Abingdon 138 kV
Location
Washington County, Virginia
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
26 July 2021
Proposed online date
July 2024
Withdrawn
December 2024

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem