SOLAR · MISOSolar project J3042, St. John The Baptist Parish County
Solar project J3042, St. John The Baptist Parish County is a 150 MW solar request in interconnection study in the MISO interconnection queue, in St. John The Baptist Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3042
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- WATERFORD 230 SWYD - VACHERIE 230.0kV
- Location
- St. John The Baptist Parish County, Louisiana
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- January 2026
Location
Marker shows the centre of St. John The Baptist Parish County; the queue data does not give exact sites.
Other requests in St. John The Baptist Parish County
- Solar project J1797, St. John The Baptist Parish CountySolar · 100 MW · withdrawn
- Solar project J1959, St. John The Baptist Parish CountySolar · 100 MW · withdrawn
- Battery storage project J1956, St. John The Baptist Parish CountyBattery storage · 60.0 MW · withdrawn
- Battery storage project J1958, St. John The Baptist Parish CountyBattery storage · 60.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem