United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
BATTERY STORAGE Β· MISOBattery storage project J1958, St. John The Baptist Parish County
Battery storage project J1958, St. John The Baptist Parish County is a 60.0 MW battery storage request withdrawn in the MISO interconnection queue, in St. John The Baptist Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2021 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1958
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- Waterford 230kV
- Location
- St. John The Baptist Parish County, Louisiana
- Technology
- Battery: 60.0 MW
- Total requested
- 60.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 30 November 2021
- Proposed online date
- October 2025
- Withdrawn
- October 2023
Location
Marker shows the centre of St. John The Baptist Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in St. John The Baptist Parish County
- Solar project J3042, St. John The Baptist Parish CountySolar Β· 150 MW Β· in study
- Solar project J1797, St. John The Baptist Parish CountySolar Β· 100 MW Β· withdrawn
- Solar project J1959, St. John The Baptist Parish CountySolar Β· 100 MW Β· withdrawn
- Battery storage project J1956, St. John The Baptist Parish CountyBattery storage Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem