United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
GAS Β· MISOGas project J4109, Iberville Parish County
Gas project J4109, Iberville Parish County is a 1,300 MW gas request withdrawn in the MISO interconnection queue, in Iberville Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J4109
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- DONALDSONVILLE - EVERGREEN 230.0kV
- Location
- Iberville Parish County, Louisiana
- Technology
- Gas: 1,300 MW
- Total requested
- 1,300 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 7 October 2025
- Proposed online date
- June 2030
- Withdrawn
- December 2025
Location
Marker shows the centre of Iberville Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Iberville Parish County
- Gas project J1246, Iberville Parish CountyGas Β· 725 MW Β· agreement signed
- Solar project J1583, Iberville Parish CountySolar Β· 175 MW Β· agreement signed
- Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW ChemGas Β· 1,232 MW Β· in study
- Gas project J4138, Iberville Parish CountyGas Β· 805 MW Β· in study
- Gas project J4191, Iberville Parish CountyGas Β· 805 MW Β· in study
- Gas project J4190, Iberville Parish CountyGas Β· 707 MW Β· in study
- Solar project J2224, Iberville Parish CountySolar Β· 200 MW Β· in study
- Gas project J4166, Iberville Parish CountyGas Β· 710 MW Β· withdrawn
- Solar project J1073, Iberville Parish CountySolar Β· 300 MW Β· withdrawn
- Solar project J567, Iberville Parish CountySolar Β· 202 MW Β· withdrawn
- Solar project J1099, Iberville Parish CountySolar Β· 200 MW Β· withdrawn
- Solar project J1668, Iberville Parish CountySolar Β· 194 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem