Solar is a 20.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Oxford County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2024 (completed)
  2. Withdrawn / abandonedAug 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1578
Grid region
ISO-NE (New England)
Connection point (POI)
CMP 115kV Woodstock Substation
Location
Oxford County, Maine
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
26 June 2024
Proposed online date
June 2028
Withdrawn
August 2024

Location

Marker shows the centre of Oxford County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Oxford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem