United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMMaysville Solar 2
Maysville Solar 2 is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Mercer County, Pennsylvania, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-487
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Developer
- PD Solar 11 LLC
- Connection point (POI)
- Camp Reynolds 12.5 kV
- Location
- Mercer County, Pennsylvania
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 January 2025
- Proposed online date
- July 2024
- Withdrawn
- December 2025
Location
Marker shows the centre of Mercer County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Mercer County
- MC Solar ISolar Β· 50.0 MW Β· agreement signed
- Jackson Center Solar FacilitySolar Β· 20.0 MW Β· agreement signed
- Jackson Center Solar IISolar Β· 20.0 MW Β· agreement signed
- Welcome Solar, LLCSolar + storage Β· 19.9 MW Β· agreement signed
- Other project AI1-053, Mercer CountyOther Β· 6.6 MW Β· in study
- Solar project AI2-467, Mercer CountySolar Β· 5.8 MW Β· in study
- Solar project AI2-469, Mercer CountySolar Β· 5.8 MW Β· in study
- Solar project AI2-470, Mercer CountySolar Β· 5.8 MW Β· in study
- Solar project AH2-023, Mercer CountySolar Β· 5.0 MW Β· in study
- Solar + storage project AH2-181, Mercer CountySolar + storage Β· 3.0 MW Β· in study
- Solar + storage project AG1-490, Mercer CountySolar + storage Β· 125 MW Β· withdrawn
- Solar project AE2-193, Mercer CountySolar Β· 120 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem