ONSHORE WIND · PJM

Buckeye Wind Farm - Phase 2

Buckeye Wind Farm - Phase 2 is a 100 MW onshore wind request withdrawn in the PJM interconnection queue, in Champaign County, Ohio, connecting to Dayton.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2006 (completed)
  2. Withdrawn / abandonedSep 2019 (project stopped here)
  3. ConsentedSep 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R52A
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dayton
Connection point (POI)
Kings Creek 69kV
Location
Champaign County, Ohio
Technology
Wind: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
6 December 2006
Agreement signed
15 September 2014
Proposed online date
December 2019
Withdrawn
September 2019

Location

Marker shows the centre of Champaign County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Champaign County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem