United States › Grid › Interconnection queues › Ohio

ONSHORE WIND · PJM

Buckeye Wind Farm - Phase 1

Buckeye Wind Farm - Phase 1 is a 200 MW onshore wind request withdrawn in the PJM interconnection queue, in Champaign County, Ohio, connecting to Dayton.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2006 (completed)
  2. Withdrawn / abandonedFeb 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R52
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dayton
Connection point (POI)
Mechanicsburg - Darby
Location
Champaign County, Ohio
Technology
Wind: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
6 December 2006
Proposed online date
December 2019
Withdrawn
February 2018

Location

Marker shows the centre of Champaign County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Champaign County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem