Battery storage project C3-147, Sweetwater County

Battery storage project C3-147, Sweetwater County is a 350 MW battery storage request withdrawn in the West interconnection queue, in Sweetwater County, Wyoming, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C3-147
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Anticline substation
Location
Sweetwater County, Wyoming
Technology
Battery: 350 MW
Total requested
350 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
15 May 2023
Proposed online date
May 2027

Location

Marker shows the centre of Sweetwater County; the queue data does not give exact sites.

Power plants in Wyoming Β· Transmission lines in Wyoming

Other requests in Sweetwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem