United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

BATTERY STORAGE Β· MISO

Battery storage project J3264, Otsego County

Battery storage project J3264, Otsego County is a 300 MW battery storage request withdrawn in the MISO interconnection queue, in Otsego County, Michigan, connecting to METC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3264
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
LIVINGSTON CO
Location
Otsego County, Michigan
Technology
Battery: 300 MW
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
12 April 2024
Proposed online date
September 2028
Withdrawn
December 2025

Location

Marker shows the centre of Otsego County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Otsego County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem