United States › Grid › Interconnection queues › Michigan
SOLAR · MISOSolar project J3134, Otsego County
Solar project J3134, Otsego County is a 150 MW solar request in interconnection study in the MISO interconnection queue, in Otsego County, Michigan, connecting to WOLVERINE POWER SUPPLY COOPERATIVE.
Queue statusIn planning
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3134
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- WOLVERINE POWER SUPPLY COOPERATIVE
- Connection point (POI)
- Gaylord Interconnection
- Location
- Otsego County, Michigan
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- June 2025
Location
Marker shows the centre of Otsego County; the queue data does not give exact sites.
Other requests in Otsego County
- Solar project J1603, Otsego CountySolar · 200 MW · agreement signed
- Battery storage project J1863, Otsego CountyBattery storage · 60.0 MW · in study
- Other project L006, Otsego CountyOther · -5.0 MW · in study
- Gas project J392, Otsego CountyGas · 421 MW · built
- Battery storage project J3264, Otsego CountyBattery storage · 300 MW · withdrawn
- Battery storage project J3416, Otsego CountyBattery storage · 200 MW · withdrawn
- Solar + storage project J3676, Otsego CountySolar + storage · 93.0 MW · withdrawn
- Gas project J3637, Otsego CountyGas · 90.0 MW · withdrawn
- Solar project J1015, Otsego CountySolar · 80.0 MW · withdrawn
- Solar project J1892, Otsego CountySolar · 64.8 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem