United States βΊ Grid βΊ Interconnection queues βΊ Michigan
SOLAR Β· MISOSolar project J1892, Otsego County
Solar project J1892, Otsego County is a 64.8 MW solar request withdrawn in the MISO interconnection queue, in Otsego County, Michigan, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1892
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Livingston - Keystone 345 kV
- Location
- Otsego County, Michigan
- Technology
- Solar: 64.8 MW
- Total requested
- 64.8 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3
- Queue status
- Withdrawn
- Entered queue
- 24 August 2021
- Proposed online date
- November 2023
- Withdrawn
- November 2021
Location
Marker shows the centre of Otsego County; the queue data does not give exact sites.
Other requests in Otsego County
- Solar project J1603, Otsego CountySolar Β· 200 MW Β· agreement signed
- Solar project J3134, Otsego CountySolar Β· 150 MW Β· in study
- Battery storage project J1863, Otsego CountyBattery storage Β· 60.0 MW Β· in study
- Other project L006, Otsego CountyOther Β· -5.0 MW Β· in study
- Gas project J392, Otsego CountyGas Β· 421 MW Β· built
- Battery storage project J3264, Otsego CountyBattery storage Β· 300 MW Β· withdrawn
- Battery storage project J3416, Otsego CountyBattery storage Β· 200 MW Β· withdrawn
- Solar + storage project J3676, Otsego CountySolar + storage Β· 93.0 MW Β· withdrawn
- Gas project J3637, Otsego CountyGas Β· 90.0 MW Β· withdrawn
- Solar project J1015, Otsego CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem