πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Larisa Solar

Larisa Solar is a 408 MW solar request withdrawn in the ERCOT interconnection queue, in Jones County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedJan 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0285
Grid region
ERCOT (Texas)
Developer
ABEI ENERGY & INFRASTRUCTURE LLC
Connection point (POI)
Mulberry Creek β€šΓ„Γ¬ Perigee 345 kV line
Location
Jones County, Texas
Technology
Solar: 408 MW
Total requested
408 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
23 April 2019
Proposed online date
December 2024
Withdrawn
January 2024

Location

Marker shows the centre of Jones County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Jones County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem