πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί West Virginia

ONSHORE WIND Β· PJM

Mt Storm WF

Mt Storm WF is a 150 MW onshore wind request withdrawn in the PJM interconnection queue, in Grant County, West Virginia, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2004 (completed)
  2. Withdrawn / abandonedFeb 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
M23
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Henry 138kV
Location
Grant County, West Virginia
Technology
Wind: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
26 July 2004
Proposed online date
December 2015
Withdrawn
February 2016

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in West Virginia Β· Transmission lines in West Virginia

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem