United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
SOLAR Β· PJMSolar project AG2-655, Grant County
Solar project AG2-655, Grant County is a 500 MW solar request withdrawn in the PJM interconnection queue, in Grant County, West Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-655
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Mount Storm Solar, LLC
- Connection point (POI)
- Mt. Storm-Bismark 500 kV
- Location
- Grant County, West Virginia
- Technology
- Solar: 500 MW
- Total requested
- 500 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 31 March 2021
- Proposed online date
- June 2024
- Withdrawn
- July 2025
Location
Marker shows the centre of Grant County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Grant County
- Onshore wind project AG2-062, Grant CountyOnshore wind Β· 147 MW Β· in study
- Greenland Gap WFOnshore wind Β· 300 MW Β· built
- Greenland Gap WFOnshore wind Β· 60.0 MW Β· built
- Mount Storm Unit 2Coal Β· 38.0 MW Β· built
- Mount Storm Unit 1Coal Β· 38.0 MW Β· built
- Other project AI1-202, Grant CountyOther Β· 450 MW Β· withdrawn
- Battery storage project AH1-256, Grant CountyBattery storage Β· 240 MW Β· withdrawn
- Mount Storm Repower BESS 1Battery storage Β· 240 MW Β· withdrawn
- Onshore wind project X3-036, Grant CountyOnshore wind Β· 150 MW Β· withdrawn
- Mt. Storm Wind ForceOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project H04_W64, Grant CountyOnshore wind Β· 150 MW Β· withdrawn
- Mt Storm WFOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem