🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Connecticut

GAS · ISO-NE

Gas Turbine Capacity Increase ( See queue position

Gas Turbine Capacity Increase ( See queue position is a 18.4 MW gas request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2006 (completed)
  2. Withdrawn / abandonedMay 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
182
Grid region
ISO-NE (New England)
Connection point (POI)
345 kV line # 321
Location
Fairfield County, Connecticut
Technology
Gas: 18.4 MW · Oil
Total requested
18.4 MW
Service type
Other
Queue status
Withdrawn
Entered queue
20 October 2006
Proposed online date
June 2010
Withdrawn
May 2009

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Fairfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem