United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Sunnynook Solar Center

Sunnynook Solar Center is a 1,029 MW solar + storage request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedApr 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1640
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Devers-San Bernardino Line 230 kV
Location
Riverside County, California
Technology
Solar: 514 MW · Battery: 514 MW
Total requested
1,029 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
September 2026
Withdrawn
April 2020

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem