Gas project J3842, Richland Parish County

Gas project J3842, Richland Parish County is a 770 MW gas request withdrawn in the MISO interconnection queue, in Richland Parish County, Louisiana, connecting to ENTERGY MISSISSIPPI, LLC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3842
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY MISSISSIPPI, LLC.
Connection point (POI)
Smalling 230kV Substation
Location
Richland Parish County, Louisiana
Technology
Gas: 770 MW
Total requested
770 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
31 October 2024
Proposed online date
January 2028
Withdrawn
September 2025

Location

Marker shows the centre of Richland Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in Richland Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem