United States βΊ Grid βΊ Interconnection queues βΊ Kansas
SOLAR + STORAGE Β· SPPSolar + storage project GEN-2023-050, Labette County
Solar + storage project GEN-2023-050, Labette County is a 400 MW solar + storage request withdrawn in the SPP interconnection queue, in Labette County, Kansas, connecting to Evergy.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-050
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- Evergy
- Connection point (POI)
- Neosho 345 kV Substation
- Location
- Labette County, Kansas
- Technology
- Solar: 400 MW Β· Battery
- Total requested
- 400 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- December 2028
- Withdrawn
- August 2025
Location
Marker shows the centre of Labette County; the queue data does not give exact sites.
Other requests in Labette County
- Gas project GEN-2024-129, Labette CountyGas Β· 910 MW Β· in study
- Battery storage project GEN-2021-006, Labette CountyBattery storage Β· 300 MW Β· in study
- Solar project GEN-2022-006, Labette CountySolar Β· 200 MW Β· in study
- Onshore wind project GEN-2020-052, Labette CountyOnshore wind Β· 251 MW Β· withdrawn
- Solar project GEN-2022-005, Labette CountySolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem