United States βΊ Grid βΊ Interconnection queues βΊ Kansas
ONSHORE WIND Β· SPPOnshore wind project GEN-2020-052, Labette County
Onshore wind project GEN-2020-052, Labette County is a 251 MW onshore wind request withdrawn in the SPP interconnection queue, in Labette County, Kansas, connecting to WERE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2020-052
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Connection point (POI)
- Neosho-Delaware 345 kV
- Location
- Labette County, Kansas
- Technology
- Wind: 251 MW
- Total requested
- 251 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 29 April 2020
- Proposed online date
- December 2025
- Came online
- December 2025
- Withdrawn
- March 2024
Location
Marker shows the centre of Labette County; the queue data does not give exact sites.
Other requests in Labette County
- Gas project GEN-2024-129, Labette CountyGas Β· 910 MW Β· in study
- Battery storage project GEN-2021-006, Labette CountyBattery storage Β· 300 MW Β· in study
- Solar project GEN-2022-006, Labette CountySolar Β· 200 MW Β· in study
- Solar + storage project GEN-2023-050, Labette CountySolar + storage Β· 400 MW Β· withdrawn
- Solar project GEN-2022-005, Labette CountySolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem