Onshore wind project G644, Stevens County

Onshore wind project G644, Stevens County is a 20.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Stevens County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2006 (completed)
  2. Withdrawn / abandonedAug 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G644
Grid region
MISO (Midcontinent)
Connection point (POI)
GRE Morris Tap - Walden 115 kV
Location
Stevens County, Minnesota
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
26 May 2006
Proposed online date
June 2007
Withdrawn
August 2014

Location

Marker shows the centre of Stevens County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Stevens County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem